APC Smart-UPS commands
vv
From some old notes, to not get lost...
command | action |
Y | enter “smart” mode |
U | simulate power failure |
D | start calibration cycle (works only if battery charge considered 100%) |
W | perform self-test |
E | set automatic self-test interval |
B | query battery voltage |
f | query battery charge level, % |
j | query estimated runtime on battery |
P | query load ratio (current load to unit’s rated max load) |
C | query internal temperature |
L | query input voltage |
O | query output voltage |
M | query max line voltage since unit reset |
N | query min line voltage since unit reset |
l (lowercase L) | set lower admissible line voltage |
u | set upper admissible line voltage |
e | set battery charge level prior to powering the load |
r | set wakeup delay |
s | set unit sensitivity (high/medium/low) |
q | set “low battery” signaling level, in estimated runtime minutes |
o | set lowest battery admissible voltage |
p | set shutdown delay (time since UPS shutdown command) |
n | queries some number (unit serial?) |
G | queries cause of last transfer to batteries. returns:
|
X | query self-test result. returns:
|